10/1/18 East Rec Renovation Update

Last Updated: 10-02-18


Sidewalk to the pool from the parking lot was too steep for ADA compliance (more like a Disneyland ride going downhill).



This hole is where old hot tub was. If you remember, it was sitting up too high to salvage to meet the proper ADA slope between it and the pool.



Those irrigation lines running to this irrigation box on the old deck post on the utility side of the building where the addition is going have irrigation lines running where the footings for the addition are. Needless to say, they will need to be relocated.



We expect the driveway work and water line to the street for sprinklers work to begin around Nov.15th. Parking lot could be closed for a week to 10 days at that time.

We will keep you posted.

Iris F. Harrell
BCC Chair OVA

We are all in this together…2018